Distributed capacity
Capacity that already exists, scattered across garages, rooftops, and small labs, waiting only for coordination to become a system. The grid, the fleet, the network was often already built — nobody had switched it on together.
The Grid Was Already Built
745 MW appeared on California's grid this week. Not from a power plant. From people's garages.
The Buyer, Not the Breakthrough
Fusion's first committed customer may be a datacenter, not a grid. A technology with a buyer is a different beast than a technology with a timeline.
Small Satellites, Big Coordination
Kolibri-1 is the size of a shoebox. Getting it to work took the same coordination as missions a thousand times its size.